Friday 19 April 2024
 
»
 
»
Story

SGRE wind farm in India

Siemens Gamesa secures 300MW wind project deal in India

MUMBAI, April 26, 2018

Siemens Gamesa Renewable Energy, a leading provider of wind power products and solutions, has secured its largest wind turbine order of 300 MW in India, at which it will install 143 of its SG 2.1-122 turbines.

Under the terms of the EPC contract entered into with Sembcorp Green Infra, a 100 per cent subsidiary of Sembcorp Energy India. The order is the largest single order secured by Siemens Gamesa in India, said a statement.

Sembcorp Energy India Limited (SEIL) is a leading independent power producer with a successful track record of identifying, developing and operating power generation assets across the thermal and renewable power sectors in India.

As of December 31, 2017, the company has a well-balanced and diversified portfolio of power assets, with an overall power generation capacity of approximately 4.37 GW spread across seven states.

Siemens Gamesa will provide all of the infrastructure needed to equip and operate the facility, located in Gujarat state, in western India. It will also maintain the facility, which is due to be commissioned in April 2019, for 10 years.

The other milestone implied by this contract is the fact that it is the first order placed for the SG 2.1-122, a turbine specifically fine-tuned for low-speed sites such as those prevalent in India, said a statement.

The wind farm will be connected to India’s Interstate Transmission System and supply power to multiple states, helping them to meet their renewable energy requirement, it said.

Ramesh Kymal, CEO of Siemens Gamesa's onshore division in India, said: “This contract marks a landmark in Siemens Gamesa's strategy in India on account of both the size of the project and the technology selected.”

“Moreover, it sends a very positive signal regarding the market's momentum and shores up our confidence in its full recovery,” he added.

Present in India since 2009, the accumulated base installed by Siemens Gamesa recently topped the 5 GW mark. The company has two blade factories in Nellore (Andhra Pradesh) and Halol (Gujarat), a nacelle factory in Mamandur (Chennai, Tamil Nadu) and a service centre in Red Hills (Chennai, Tamil Nadu), it stated. – TradeArabia News Service




Tags: | India | project | Wind | 300MW | Siemens Gamesa |

More Energy, Oil & Gas Stories

calendarCalendar of Events

Ads