SLB has secured a contract from Equinor to expand real-time leak detection, virtual flow metering and digital production monitoring at the Johan Sverdrup Phase 3 development in Norway’s North Sea.
The award extends digital monitoring across new subsea
infrastructure, including wells, pipelines, subsea templates and multiphase
flowlines, as the major offshore field’s production network expands.
The contract builds on SLB’s previous deployment of its Olga
Online production management system during Johan Sverdrup Phase 2.
The technology combines first-principles multiphase flow
modelling with real-time analytics to provide production surveillance and
support early leak detection.
Under the Phase 3 deployment, Equinor will gain expanded
visibility across the production network, including information on potential
leak size, location and severity.
The system is designed to help improve operational
reliability, support safe operations and optimise production performance
throughout the field’s operating life.
Johan Sverdrup is one of Equinor’s strategically important
producing assets on the Norwegian Continental Shelf, where increasingly complex
subsea networks are driving demand for digital technologies that can improve
operational visibility and asset integrity.
SLB will implement the system ahead of production from the
new Phase 3 facilities and will support delivery, commissioning and long-term
operation.
The deployment reflects the increasing use of digital
production technologies in offshore operations, particularly as operators seek
to improve recovery, manage complex infrastructure and extend the efficiency of
long-life assets in mature offshore regions. -OGN/TradeArabia News Service