Plenitude, a company controlled by Eni, has started production at the second 200 MW block of the Renopool photovoltaic project, located in the municipality of Solana de los Barros, in Badajoz (Extremadura, Spain).
Plenitude, controlled by Eni, and Methagora signed a 15-year deal for 50 GWh of biomethane annually from French agricultural sources, supporting France’s Biomethane Production Certificates (BPC) scheme.
Plenitude has inaugurated the 150 MW Caparacena solar project in Chimeneas, Granada. Spanning 264 hectares with three 50 MW photovoltaic parks and over 274,000 bifacial modules, it will generate around 320 GWh of electricity annually, marking a major addition to Plenitude’s Spanish portfolio.