Soiltech has been awarded a contract by Wellbore Integrity Solutions in Dubai to deliver fluid treatment services.
The contract involves
the use of Soiltech’s field-proven Swarf Removal System (ST-SRS) to remove
metal residues (swarf) from drilling fluids during offshore milling operations
in the Middle East region.
The contract has a duration of three years, with extension options, and is expected to represent a substantial¹ value for Soiltech over the initial period.
Startup of operations
is scheduled for the second quarter of 2026.
“This is a
strategically important contract for Soiltech as we continue to strengthen our
presence in the Middle East,” says Glenn Åsland, Chief Operating Officer of
Soiltech. “By utilising our Swarf Removal System, we ensure that swarf from the milling
process is handled in an environmentally responsible manner, enabling recovery
and reuse of drilling fluids while minimising waste.” -TradeArabia News Service